History
History
| Year | Activity |
|
2008 |
Commenced operations in Perth, WA |
|
2008 |
Awarded a contract to design and supply 1 x 300 tonne Powered Reel Drive Base / Under Rollers. |
|
2009 |
Commissioned by Apache to remove 260 tonnes of flowline from a Ø9600 mm reel |
|
2009 |
Designed and supplied Hydraulic and Pneumatic man riding winches to the sub sea construction industry |
|
2009 |
Jointly developing an Deep Ocean Deployment System to handle 250 tonnes up to a depth of 3000 msw |

Latest News